Adelaide Terrace Hotel

Adelaide Terrace, Perth
Private Developer Completed : Estimated 2017 Cost : Not Disclosed

HCP have undertaken the revised Schematic Design, Design Development & Contract Documentation of this 18 storey, 252 room hotel located in the heart of the Perth CBD. The project will be a combina more...

Caversham Shopping Centre

175 Suffolk Street, Caversham
Lightway Holdings Pty Ltd Completed : April 2016 Cost : $14,000,000

Hodge Collard Preston undertook the schematic design, design development, contract documentation and contract administration for this neighbourhood shopping centre located in Caversham amongst a newly more...

Mills Park Community Facility

Brixton Street, Beckenham
City of Gosnells Completed : 2016 Cost : $16,000,000

Construction is now complete on Australia’s first 6 Star Green Star Public Building, Design Version 1, designed by Hodge Collard Preston Architects. The comprehensive submission assesses the design more...

Hale Village Mixed Use Development

Lot 33 Hale Road, Wattle Grove
Aigle Royal Properties Completed : Under Construction Cost : $6,500,00.00

Construction is now underway of the Hale Village – Mixed Use Development which includes 1,600sqm of retail space, Childcare Centre, 7 Eleven Service Station and Muzz Buzz Drive Thru Coffee. The deve more...

Wanneroo Commercial Development

Wanneroo Road, Balcatta
Quick Service Retail Completed : Development Approval Lodged Cost : Not Disclosed

The proposed development incorporates a suburban medical centre, pharmacy tenancy, convenience store and service station. The design is sympathetic to the neighbouring properties whilst providing a co more...

Commercial Development

Midvale
Completed : Cost :

Proposed Medical Centre Hodge Collard Preston were engaged to prepare a schematic design of a proposed Medical Centre for Development Approval purposes. It will form a part of a bigger mixed-use comme more...

Inglewood Primary School

34 Normanby Road, Inglewood
Building Management and Works Completed : Currently in Documentation Cost : 2,600,000.00

2-Story Classroom Building As part of the Inner City Schools program, Inglewood Primary School will receive a new 2-story teaching block comprised of 6 flexible classrooms with associated activity and more...

Mantra Hotel

195 Hay Street, East Perth
195 Hay Street Pty Ltd Completed : 2018 Cost : Not Disclosed

The proposed development is for a Budget hotel offering on a narrow restrictive site consisting of: • Ground floor public areas with a high level of interaction to the street environment • Sixteen more...

Leighton Beach Hotel

North Fremantle
Private Hotel Group Completed : Estimated 2017 Cost : Not Disclosed

Hodge Collard Preston are undertaking the detailed design and documentation of this 5 Storey 100 room hotel. The hotel will be a 5 Star hotel including restaurants, bars, function rooms, pool deck are more...

Camillo Apartments

Camillo
Seville Corporation Pty Ltd Completed : Estimated June 2019 Cost : Not Disclosed

The development covers two sites which stretch approximately 1km across the Kelmscott railway line and is located in the City of Armadale approximately 23 kilometres South East of the Perth CBD. The d more...

Queen Victoria Street Apartments

Queen Victoria Street
Private Developer Completed : Development Approval Cost : 15,000,000.00

The proposal is for the Development of 42 Residential Dwellings in a distinctive dual tower design; the development is located in a significant heritage area and the design compliments and addresses i more...

Beach Street Apartments

Lots 1, 170 & 171 Beach Street, Fremantle
Private Developer Completed : Development Approval Received Cost : $25,000,000

The proposal is for the development of 71 Residential Dwellings in a distinctive dual tower design; promoting and celebrating the dramatic vantage points and vistas available due to its unique and exc more...

Kinross College

Falkland Way, Kinross
Building Management & Works Completed : 2017 Cost : $4,000,000.00

Kinross College was originally built on the now redundant ‘open community’ style of teaching and now requires the refurbishment of vast open spaces into discrete yet flexible classrooms suitable f more...

Coles Supermarket Claremont Quarters

Clara's Lane & Gugeri Street, Claremont Arcade
Coles Supermarkets Australia Completed : December 2016 Cost : $1,000,000.00

Hodge Collard Preston were involved in the documentation and construction of Coles Claremont Quarters store renewal. The renewal incorporates Coles latest decor to the deli and prep areas and their ne more...

Davies Road Apartments

Davies Road, Claremont
Heaton Investments Completed : October 2016 Cost : Not Disclosed

Located on a busy traffic intersection, the development has optimized the sites potential with 6 one bedroom apartments. The building is located to the north west of the site addressing both street fr more...

Beadon Bay Hotel

Lot 1 Second Avenue, Onslow
The Complete Group Completed : 2016 Cost :

Hodge Collard Preston were engaged to undertake the schematic design for the renovation and refurbishment of the Heritage listed Beadon Bay Hotel and the addition of 60 motel rooms located on the adja more...

Coles Cockburn Gateway

Cockburn Gateway, WA
Coles Supermarket Australia Pty Ltd Completed : November 2015 Cost : $3,190,000

Hodge Collard Preston were involved in the documentation and construction stages of Coles Cockburn Gateway store renewal, incorporating the latest Coles Standard within an existing store. The renewal more...

Coles Supermarket Pinjarra

21-29 George Street, Pinjarra
Coles Supermarket Australia Pty Ltd Completed : 2015 Cost : $1,900,000

Hodge Collard Preston were involved in the documentation and construction stages of Coles Pinjarra store renewal, incorporating the latest Coles standard within an existing store. From the beautiful b more...

Sorrento Primary School Administration Building

Elfreda Avenue, Sorrento
Building Management and Works Completed : July 2015 Cost : $1,500,000

Hodge Collard Preston completed the design, documentation and administration for the construction of a new administration building and the refurbishment of an existing building for use as the staff ro more...

Nollamara Primary School Library

101 Harrison Street, Nollamarra
Building Management and Works Completed : March 2015 Cost : $1,200,000

Nollamara Primary School is a culturally diverse Intensive English Learning Primary School and the need for an interactive and appealing New Library and Resource Centre to integrate within an establis more...

Coles Supermarket Baldivis

Lot 26 Safety Bay Road, Baldivis
Coles Supermarket Australia Pty Ltd Completed : November 2014 Cost : $1,800,000

Hodge Collard Preston were involved in the documentation and construction stages of Coles Baldivis store renewal, incorporating the latest Coles standard within an existing store. From the beautiful more...

Dampier Port Authority Housing

First Avenue, Onslow
Dampier Port Authority Completed : August 2014 Cost : $3,500,000

The Project involved the design and documentation of Residential Accommodation for the use by Dampier Port Authority (DPA) staff whilst working in Onslow for various periods. Specific Design consider more...

Haynes Shopping Centre

Lot 700 Eighth Road, Armadale WA
Neerigen Brook Estate Pty Ltd Completed : 2013 Cost : $16,000,000

The shopping centre is located at the corner of Armadale and Eighth Roads in Armadale. The site was originally a horse training facility, which had local historical significance. The brief was to prov more...

Concorde South Apartments

Forrest Circle, Port Hedland
Hickory Group Completed : 2014 Cost : $25,000,000

Hodge Collard Preston designed and documented the Concorde Modular Apartments in South Hedland which was the first Multi Storey Modular Apartment building in Western Australia. Our brief was to design more...

Carine Senior High School

Everingham Street, Carine
Building Management and Works Completed : April 2014 Cost : $4,300,000

Hodge Collard Preston were commissioned by Building Management and Works (BMW) to undertake the design, documentation and contract administration of the new Year 7 facility, in accordance with the Dep more...

West Balcatta Primary School Administration Upgrade

West Balcatta Primary School
Building Management and Works and Department of Education Completed : January 2014 Cost : $1,500,000

The project incorporated an upgrade and extension to the existing school administration building, bringing the building up to the Department of Education’s Primary School Brief requirements. The more...

Wellard Community Centre

Corner of The Strand & Runnymede Gate
City of Kwinana Completed : December 2013 Cost : $6,000,000

The brief was to design a focal point of the newly developed The Village at Wellard which would act as a catalyst for commercial and multi-residential developments in the area. The design was determin more...

Yandi Fixed Plant Workshop

Yandicoogina Mine, Rio Tinto
RED Engineers and Linkforce Engineering Completed : August 2013 Cost : $20,000,000

The Yandi Fixed Plant Workshop was undertaken as a joint venture between Hodge Collard Preston Architects, RED Engineers and Linkforce Engineering and comprised a 2275 m² 8 bay maintenance workshop, more...

REIWA House

Hay Street, Subiaco
REIWA Completed : 2013 Cost : $7,900,000

The project seeks to provide the streetscape with a more sophisticated condition where the street setback is minimised while maintaining a sense of relief to the elevation at both human and urban scal more...

Shark Bay Community Sports Centre

Francis Street, Denham
Shire of Shark Bay Completed : 2013 Cost : $6,000,000

Hodge Collard Preston won a public tender for this project which includes the schematic design to contract administration of a new indoor Community/Sports Centre. more...

Busselton & Dunsborough Community Resource Centre

Harris Road, Busselton WA
Shire of Busselton Completed : October 2012 Cost : $6,500,000

The Busselton-Dunsborough Community Resource Centre will provide a hub for non-profit organisations servicing the needs of the community. The contemporary design features sustainable design initiative more...

York Recreation and Convention Centre

York
Shire of York Completed : 2011 Cost : $7,000,000

York Recreation and Convention Centre represents an all encompassing community sporting precinct that caters for local residents of all ages on a daily basis, whilst also accommodating special communi more...

AMPAC Office/ Warehouse

Ledger Road, Balcatta
AMPAC Technologies Completed : 2009 Cost : $8,000,000

Our client purchased a property with an existing office and factory which was structurally sound but dated.  Our design brief was to refurbish the existing building and alter it to be suitable for a more...

Forrestfield Office/ Warehouse

Abernethy Road, Forrestfield
Merit Projects Completed : May 2009 Cost : $15,000,000

Our Client purchased a vacant site from Landcorp and was required to construct a building within 2 years of the purchase date. The site was advertised by the Real Estate Agent for nearly 2 years on th more...

Murray Street Office Building

432 Murray Street, Perth WA
First State Developments Completed : February 2009 Cost : $18,000,000

more...

Dunsborough Shopping Centre

Dunn Bay Road, Dunsborough
DCSC Pty Ltd Completed : Stage 1 2003 – Stage 4 2008 Cost : $20,000,000

This town centre shopping centre includes a Coles supermarket, nineteen specialty shops, first floor office facilities, showrooms with possible future expansion. The design addresses the towns streets more...

176 Cambridge Street

176 Cambridge Street, West Leederville
Hewitt Medical Services Completed : 2008 Cost : $4,500,000

The building is located on a corner site opposite the St John of God Hospital Subiaco and comprises a basement car park, consulting rooms on the ground floor and two apartments on the upper floor. The more...

Newman Eco Village

Gun Club Road, Newman
BHP Billiton Iron Ore Completed : 2007 Cost : $20,000,000

Hodge Collard Preston were engaged to produce an expression of interest document for contractors to provided proposals for the construction of 59 energy efficient and sustainable accommodation units i more...

Raytheon

Cnr Coogee and Russell Roads, Henderson
Clough Pty Ltd Completed : December 2006 Cost : $10,000,000

New corporate headquarters for Raytheon Australia, located in the main complex at Henderson. The building includes a two story office and workshop area, all in accordance with the department of Defenc more...

CBH Refurbishment

22 Delhi Street, West Perth
First State Developments Completed : 2006 Cost : $7,000,000

The refurbishment of the existing six storey building, including the upgrade of all services, finishes and amenities. New lobbies were created to all floors.  A new entry statement and lobby were pro more...

Atlas Copco

33 Reid Road, Perth Airport
Atlas Copco Completed : September 2005 Cost : $6,000,000

The development of this building was divided into two areas, industrial fit-out of the workshop area and the separate fitout of the office area. The workshop fit out incorporated two storey office are more...

Sons of Gwalia Office Extension

14 Parliament Place, West Perth
Pivot Group Pty Ltd Completed : November 2002 Cost : $8,000,000

The project involved the design, documentation and contract administration of a 4 Storey Office Building Extension to the existing building. The design carefully integrates the new extension with the more...

Garden Office Park

355 Scarborough Beach Road, Osborne Park
Garden Office Park Pty Ltd Completed : April 2002 Cost : $20,000,000

The building comprises two basement levels of parking for a total of 160 cars and four levels of office space. The ground and first floors have a net lettable area of 1,400 sqm each and were designed more...

East Fremantle School New Library

8 Forrest Street, East Fremantle
Building Management Authority Completed : October 2001 Cost : $1,200,000

A new library building was located on the school grounds and designed to be sympathetic to the existing heritage school precinct. The library was designed in line with the Department of Housing and Wo more...

Hamersley Apartments

6 Hamersley Street, Cottesloe
Hohnen Investments Pty Ltd Completed : October 2007 Cost : $8,000,000

Cottesloe apartment building is located on a site with ocean views. The development consists of 4four luxury apartments in a three storey building with each apartment focused towards the ocean views. more...

Kingsgate Apartments

171 St. Georges Terrace, Perth
Florin Pty Ltd Completed : August 1999 Cost : $27,000,000

This project involved the conversion of the existing heritage listed MLC Office Building into retail floor space on the ground floor, office space on the first floor and apartments on the 9 upper floo more...